IC 725 Gent St Pieters → Antwerpen Centraal
IC 725 runs from Gent St Pieters to Antwerpen Centraal. Its average on-time rate is 100% (based on 88 observations). See the live status, current delay and platform below.
Frequently asked questions about IC 725
Where is IC 725 right now?
The current location of IC 725 from Gent St Pieters to Antwerpen Centraal is shown live at the top of this page, based on real-time HAFAS data from Deutsche Bahn. Position updates automatically.
Is IC 725 delayed right now?
Current delay information for IC 725 appears in the status panel at the top. The statistics below show punctuality over the recent weeks, based on 88 individual observations. Avg. delay 0.3 min, 100 % on time (≤5 min tolerance).
Which platform does IC 725 use?
The current platform for IC 725 is shown in the status tile at the top, for Gent St Pieters (departure platform) and Antwerpen Centraal (arrival platform). Last-minute platform changes are flagged with a "platform changed" notice.
When does IC 725 run?
IC 725 runs regularly between Gent St Pieters and Antwerpen Centraal. The full timetable with all stops and arrival/departure times is available further down this page.
Which stops does IC 725 serve?
IC 725 serves 6 stations: Gent St Pieters – Gent-Dampoort – Lokeren – Sint-Niklaas – Antwerpen-Berchem – Antwerpen Centraal.
All stops of IC 725
6 stations from Gent St Pieters to Antwerpen Centraal
- Gent St Pieters
- Gent-Dampoort
- Lokeren
- Sint-Niklaas
- Antwerpen-Berchem
- Antwerpen Centraal